Lexus RX 300 + Lexus RX-300 cars + Governing bodies and methods of operation + Settings and routine maintenance of the car + Engine - Cooling systems of the engine, heating, ventilation and air conditioning + Engine cooling system - Systems of heating, ventilation and air conditioning General information Replacement, dismantling and assembly of the K/V block Removal, dismantling, assembly and installation of the block of the fan of a heater Check and replacement of the compressor and K/V magnetic coupling Removal and installation of the K/V condenser Checks of components of systems of heating and To/in Removal and installation of the control unit + A power supply system and production of the fulfilled gases + Systems of electric equipment of the engine + Automatic transmission and interaxal differential + Transmission line + Brake system + Suspension bracket and steering + Body + Onboard electric equipment + Schematic diagrams of electric connections
|
Replacement, dismantling and assembly of the K/V block
Components of installation of the K/V block
Components of assembly of the K/V block
Removal
|
- Discharge the К/В coolant contour.
- Empty an engine cooling system radiator (see the Section Replacement of the Cooling Liquid (CL)).
|
To empty the engine cooling system completely there is no sense. |
- Remove levers and э / the motor of screen wipers, the left and right fairing of a windshield, a cowl and the dashboard with an intensifying bar (see the Head Kuzov).
- Disconnect the liquid and soaking-up tubes from the K/V block.
- Disconnect water hoses from heater heat exchanger tubes.
- Remove the heater fan block (see the Section Removal, dismantling, assembly and installation of the block of the fan of a heater).
- Wring out two clamps and disconnect the lower branch pipe of a heater from the central air duct.
- Remove a console No. 1 box air duct.
- Separate the socket, turn out two bolts and two nuts and remove the К/В block.
|
|
Dismantling and check
|
- Separate the electrical wiring socket, turn out two screws and remove э / the motor of production of air.
- Remove a plait of an electrical wiring and an arm.
|
-
Turn out two screws, remove two plates and pull out the heater heat exchanger.
|
- Remove the relay э / the heater fan motor.
- Turn out two screws and remove э / the air mixing motor.
- Separate the evaporator temperature sensor socket, weaken sensor clamps on a plate of an arm and remove the sensor.
- Remove the broad valve and as soon as possible to a zakuporta its adjusting flange.
- Remove an air duct from the driver.
- Turn out bolts of fastening of tubes to the evaporator and remove tubes with fittings.
- Turn out 7 screws and uncover the evaporator. Extend the evaporator.
- Check and if necessary clean cells of an ispravitel and the heat exchanger of a radiator compressed air.
- Check serviceability of functioning driving э / motors.
|
|
Assembly and installation
|
- Assembly and installation are made as it should be, the return to an order of dismantle of components. Pay attention to the next moments:
- Use new sealing rings on connections of refrigerator lines with the K/V block, and also tubes with the broad valve and with the evaporator.
- Collars of fastening of water hoses to the heat exchanger establish at distance from 1 to 7 mm from the end of a hose.
|
-
Level a tag on a drain hose.
|
|
|
|
|