LEXUS RX 300

1998 — 2003 of release

Repair and operation of the car



Lexus RX 300
+ Lexus RX-300 cars
+ Governing bodies and methods of operation
+ Settings and routine maintenance of the car
+ Engine
+ Cooling systems of the engine, heating, ventilation and air conditioning
+ A power supply system and production of the fulfilled gases
+ Systems of electric equipment of the engine
+ Automatic transmission and interaxal differential
+ Transmission line
- Brake system
   General information and security measures
   Removal, installation and check of pedals of the brake system
   Check of the brake system via the socket of the module of management
   Removal and installation of the tank and main brake cylinder (MBC)
   Removal, check and installation of the amplifier of brakes
   Replacement of brake shoes
   Removal, dismantling, check, assembly and installation of supports of brake mechanisms
   Dismantling, check and assembly of the parking brake
   Valve check of distribution of brake effort
   Removal and installation of the activator of brakes
   Removal and installation of wheel sensors
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Schematic diagrams of electric connections


2598ff35

Removal and installation of the activator of brakes

Components of installation and assembly of the activator

1 — the Broad tank of OZh
2 — Assembly of the activator
3 — GUR Tube
4 — the Activator

5 — the Holder
6 — Laying
7 — Loker of the right forward wheel arch
8 — the Arm of fastening of the activator


 PERFORMANCE ORDER

  1. Remove the right forward wheel and a loker of his arch.
  2. Turn out a bolt of fastening of the holder of a tube of GUR.
  3. Shift a broad tank of OZh forward and remove it to the holder.
  4. Separate the 4th socket and disconnect hoses from the activator of brakes.
  5. Disconnect from assembly of the activator of brakes of 6 brake tubes.
  6. Turn out two bolts and a nut and remove assembly of the activator.
  7. Turn out two nuts and remove the activator from an arm.
  8. Remove from the activator two holders and three laying.
  9. Installation is made upside-down.
  10. After installation fill the GTTs tank with brake fluid and pump over the brake system (see the Section Replacement of Brake Fluid, pumping of the brake system).


(adsbygoogle121 = window.adsbygoogle121 || []).push({});